Description
All-Safe will install your Safety Net Central Tensioning System (CTS) when you order your Safety Net. Please note that you must also order the components for the CTS installation separately within the same order. These components include Pulleys and Pulley String. Additionally, you can order the CTS Pull Cord, which you will need to thread through the pulleys. This pull cord is essential to complete the CTS installation unless you already have one on hand. We will also include the Net Safety Warning label with your purchase.
Single & Double CTS units are installed on one net, with the location determined by All-Safe.
Single & Double Offset CTS installations are placed at specific locations outlined by the reseller on a written diagram. Please email a diagram showing the CTS location on the ordered net size to order@allsafepool.com. The lead time for Double CTS installation is an additional 1-2 days.
IMPORTANT: YOU MUST SPECIFY THE CTS SIZE YOU WANT INSTALLED. LIST THE CTS SIZE (10, 12, OR 14) IN THE “MEMO ABOUT THIS ORDER” FIELD. IF NO SIZE IS SPECIFIED, WE WILL INSTALL A SIZE 12.